Day: June 19, 2013

One year later: Clovis crosswalk still not done

What takes longer to build, a half mile of road widening, or a crosswalk? If you’re in Clovis….

During April of last year, I documented the construction of a new enhanced crosswalk in Clovis, connecting a small trail system, with an elementary school. The area is residential, except for the large church adjacent to the crosswalk.

This crosswalk was special, because it was to be the type with flashing lights embedded in the concrete. Pedestrians were to push a button to turn on those lights, and also a series of flashing signs placed before the crosswalk.

This is an example across town, although this one is fancier because the system detects pedestrians automatically, and there’s a center median. You can see the lights in the pavement, and one of two flashing signs (in each direction) on the far right. Click to read more!