Year: 2016

Can Manchester Center Mall be saved?

Built in 1955, Manchester Center Mall was Fresno’s first foray into the suburban enclosed mall template*. Three and a half miles north of downtown, the Mall promised ample parking and an escape from the weather. The concept was indeed successful, and the mall expanded as the decades went by.

Well, for awhile anyway. Fresno kept expanding north (Fashion Fair opened in 1970), and Manchester Center was left behind. What was once the edge of the city became the inner city. As popularity waned, so did the investment. By the mid-90s, the mall was in serious trouble. And in 2009, when Gottschalks (139,500 square feet) closed, it was left with only Sears (186,000 square feet) as an anchor and a handful of stores catering to lower incomes. Click to read more!

Fresno Mayoral Election – What will it mean for sprawl?

If you support investment in a strong downtown, curtailing sprawl, focusing on infill, fighting slumlords, and supporting high speed rail, which candidate should you support in the upcoming Fresno mayoral election?

Downtown Fresno, before the removal of the Fulton Mall

The good news is that fortunately for Fresno, neither candidate is a disaster. Neither candidate has declared that downtown should be abandoned, or that bike lanes are part of a secret international agenda, for example. Unfortunately, that means that voting tomorrow becomes a little harder, because one has to conduct a little research.

The candidates are Democrat Henry Perea and Republican Lee Brand. If you only follow national politics, the choice seems simple. For whatever reason, over the last decades, the Republican Party has taken stances against sustainable transportation, High Speed Rail, and investment in infill. But we’re talking about Fresno, and it’s not so clear cut. Click to read more!

Discussion begins in Fresno about prioritizing frequency over coverage on the bus network

Last month, the Fresno City Council heard a workshop on a proposed restructuring of the Fresno bus system (FAX), one that would allow for improved service on trunk routes, creating 15-minute headways in the corridors with the most transit demand. 

This type of restructuring is the bread and butter of Jarrett Walker over at Human Transit. You can read about a project he worked on in Houston here. Mr. Walker has been involved with FAX on and off for a few years now. He first gave a presentation at Fresno State in October of 2010, and was then brought in by the city to create the “Metropolitan Area Public Transportation Strategic Service Evaluation (PDF)” in early 2014. You can find more on that process here. The evaluation is in fact the foundation for this new restructuring project. Mr. Walker’s team was also involved in the current proposals, which offer specific and concrete recommendations, rather than an overview of possibilities. Click to read more!

FAX to hold workshop on proposed restructuring

Tomorrow, Thursday September 1st, there will be a workshop on major changes proposed for the FAX bus system, which serves Fresno into adjacent communities. Thanks to James Sponsler who left a comment on my last post with this important tip.

This appears to be a major change by FAX standards, which runs a system that has effectively remained stagnant for 40 (yes forty) years.

The core components are:

  • Frequency
  • Grids
  • More weekend and evening service 

Effectively, the new plan reduces coverage in order to increase service. Fresno has not spent a dime in actually improving service in decades. In the past 15 years, 4 lines have been eliminated, and one was added – paid for by the Childrens Hospital. The last increase in service (to 15 minutes on core lines) was funded by a federal grant, and those improves were reveresed when the federal money dried up. While higher frequencies are fantastic, it is a shame it comes at the expense of certain neighborhoods. Click to read more!

A quick update on downtown Fresno construction projects

It’s been a few months since I’ve been able to post photos of what has been changing in downtown Fresno. Unfortunately, I haven’t had the chance to explore the area and take photos, so I present to you a different type of update. Here are some photos I took in May, along with a look at what those projects look like this week, with photos sourced from friendly people around the web. It’s amazing how much (and how little!) can change in 3 months.

Tuolumne Bridge – High Speed Rail Project 

When I last visited this project, it looked like this:

And now it looks like this: Click to read more!

Amtrak California gets new funding, trainsets (thanks Wisconsin!)

Early this week, the California State Transportation Agency sprinkled $390 million in grants around the state, courtesy of the successful Cap and Trade program. Streetsblog California highlighted the projects, but I would like to give special attention to the Amtrak funding. 


California has shown the strongest support for intercity rail in the country. Aside from developing High Speed Rail, three of Amtrak’s busiest routes exist entirely within California, and are funded by the state. Earlier this year, the San Joaquin saw a new 7th daily train, and now the other lines will get some love.


Particularly poetic is the lease of Talgo train-sets to run between Los Angeles and San Luis Obispo. What makes these trains special is that they were purchased by Wisconsin for their High Speed Rail Project. That project was cancelled by Scott Walker, but not before the trains were built, and the state was put on the hook for not following through. Click to read more!

Google Maps Launches Areas of Interest – How Accurate is it in Fresno?

A week or so ago, Google refreshed their maps service. Most of the changes were minor – new road outlines, a different typography, and a few other minor tweaks designed to make the maps easier to understand. However, as part of that update, they introduced what could be a major new feature: areas of interest.

These areas of interest are determined algorithmically, using an
automated process to pick out areas with the most stores, restaurants,
or bars, but Google says it’s also using a “human touch” in high-density
areas — like New York City — to point people to the coolest locations.
The Verge Click to read more!

A quick primer on “smart dock” vs “smart lock” bike share systems

Bike share finally came to Portland, Oregon this week, and the system has already proven to be popular. At this point, bike share in the US is no longer a novelty, as successful systems are integrated into the day-to-day life of dozens of major cities.

However, not all bike share is created the same, and Portland’s new system has the distinction of being the largest “smart-bike” system in the country. This is in contrast to most large systems which rely on “smart docks” instead.

The primary difference is the location of the electronics. In a smart
dock system, everything is handled by the dock and an attached kiosk. On
a smart bike system, the bicycle itself carries all the technology.
That means you can lock your bicycle to anything. You use a pin code to remove the built in lock and when you’re done, you reattach the lock to the bicycle (and another fixed object of course). Built in GPS ensures the company knows where the bike is. Click to read more!

Help Bring National Attention to Central California Transportation Issues

If you’re reading this blog, you know that Central California is not all sunshine when it comes to planning, development, and transportation. You also probably have a strong desire to see improvement.

For example, Fresno’s half-cent transportation tax has been devoted almost entirely to highway expansions and roadway widening. Road diet projects have been halted due to right-wing elected officials. Fresno’s pedestrian mall is being ripped up, and the BRT project is no longer BRT. Sprawl, of course, continued unabated. This pattern is true across the valley. Sure, there are bright spots and individual wins, but since I started this blog over five years ago I’ve seen much more bad than good. Click to read more!