Ten days ago, I decided to make a record of how COVID-19 (coronavirus) has affected transportation providers in Fresno and the surrounding areas – including the Bay Area and LA region. This post is a follow-up, to chronicle what has changed since. I have also added a few agencies I missed last week. It is sort of lucky I waited until today to make this, instead of last Sunday, as a bunch of changes go into effect today!
Local Transit
Fresno Area Express (FAX)
Officially, no changes to the schedule, but the system has been struggling with drivers calling out, as seen in this tweet:
We had a great day today @FresnoFAX about 20 call outs but all service went out as scheduled. Thanks for trusting us to serve you
The California High Speed Rail Authority used to post videos every month or two summarizing their construction progress. Unfortunately, that ended around October of last year. Now they’re back with a new video highlighting what has been going on. At under four minutes, it’s a good watch.
While they’ve been stingy with their videos, they have continuously updated their Flickr account. Usually new photos go up every 3-5 weeks.
Here are some of my recent favorites. I especially like the ones from angles I cannot get myself.
I’m hoping that in 2019, we see these various construction sites linked up with rails and walls. I think that once that happens, the project will really seem to be real, even though we know train service is still far away.
Additionally, one other major piece of infrastructure was recently “finished,” and that’s the train station in San Francisco.Or at least the box where it goes. Streetsblog has a tour here.
Of course, I wish this all was moving faster. But it’s still nice to see that it is moving at all.
The Amtrak San Joaquin line, running from Bakersfield to Sacramento and Oakland, is operated by the San Joaquin Joint Powers Authority (SJJPA). This local operation means we get a good amount of info on their upcoming plans. Recently, they released a draft of their new business plan. Additionally, they have a public meeting later this week. Here is a summary of what is coming up:
Early Morning Express Service
The early morning express, from Fresno to Sacramento launches on May 7. Trains will arrive in Sacramento at 7:41am. I talk about the schedule in this post.
As part of that project, which is aimed at attracting day-trippers and business travelers, parking is being expanded at various stations:
Stockton – 42 new spaces (open now)
Modesto – 108 new spaces (open now)
Turlock – 50 new spaces
Merced- 8 new spaces
Fresno- 60 new spaces
They’re planning on modifying the schedule again later this year to create a second early morning express, but one that runs from Fresno to Oakland. On one hand, this would allow people in Fresno, and north of Fresno, to get to the Bay Area early enough for work. Currently, the earliest train leaves Fresno at 6:18am, and arrives in Oakland at 10:26am. Add another 30 minutes to get into San Francisco.
On the other hand, that screws over people south of Fresno who lose another train. Like the Sacramento express, the train would start in Fresno, so no service to the south.
I think this is a mistake.
8th and 9th Daily Train coming in 2019
Since operations switched to the SJJPA, they have fulfilled long-standing plans to add service. A 6th train was added in 2002, and a 7th in 2016.
Passengers transferring in Stockton
The new 8th train will go to Sacramento starting in 2019, providing 4 trains to the Bay, and 4 to Sacramento. Note that all trains offer a free connecting bus in Stockton, so if you’re going to Oakland on a Sacramento train, you are put on a bus to Oakland in Stockton.
The new 8th train, and one of the existing trains, will actually operate on a different train line north of Stockton, due to freight traffic. They will terminate somewhere else in Sacramento, and have different stops. More details on that later this year.
However, the 9th daily is a bit of an odd-ball. It doesn’t really deserve to be called a new train. Essentially, they’re going to replace one of those bus transfers with a shuttle train that only operates between Oakland and Stockton. Because people will still have to transfer, this new train really only makes sense if it’s scheduled at rush hour, where a bus can get stuck in traffic entering or leaving SF.
The long-term plan is to have hourly service between Sacramento and Fresno by 2035.
New trains
New trains will look like this one
To keep adding service, the line needs more trains. Currently, the 7 trips are operated by 8 trains. As discussed previously, the state will be getting new trains from Siemens. They will start arriving in 2020 and end in 2023. I’m fairly confident in this timeline. The same factory just closed up production on trains for Florida, so they just have to keep moving, rather than starting from scratch.
However, these trains will be high-floor, and they still don’t how what they will be doing to address this problem.
“However, it is unclear if the current design of the Siemens car will provide a bridge plate long enough to span the distance to the mini -high platform”
For the current fleet, improved wifi is planned for 2019.
No more price buckets
Like airlines, Amtrak operates a system where tickets are priced in fare classes, or price buckets. Essentially, that works as follows:
50 tickets available at $10
Next 50 cost $13
Next 50 cost $16
Next 50 cost $20
Etc
(hypothetical numbers).
That means, as the train fills up, you pay more.
On business-heavy routes, that makes sense. A tourist that can buy 6 months in advance gets to lock in a cheap fare. A businessperson who needs a ticket on the day of, can pay 10x as much, and expense it to their company. Not only does this system make Amtrak more money, but it ensures trains go out almost full.
In theory.
This works well on the East Coast, where you can pay $49 to go between NYC and DC…or $250 the day of. Those trains are always busy.
But the San Joaquin doesn’t have business traffic. So the end result is that people who can least afford to pay – those who have to pay cash the day of – are hit with the highest fares. Additionally, San Joaquin trains very rarely sell out. Aside from Thanksgiving, there’s always room. Seats going out empty are COSTING Amtrak money. It makes more sense to sell discounted tickets the day of, to fill those seats.
Starting later this year, they will be removing “revenue management” from the San Joaquin. Instead, tickets will be priced like regular public transit: you can always know the cost to travel between two cities.
More Thurway Connections
SJJPA is looking to provide additional connections to buses that will take you to nearby cities from the train station. Existing buses offer service to Yosemite, Las Vegas, Los Angeles, and dozens of smaller cities. They’re looking at a new express bus to Redding.
Shorter Trips
It currently takes the train a little more than 6 hours to go between Bakersfield and Oakland. However, there is a labor rule that means if trips exceed 6 hours, there has to be a crew change. That’s a huge waste of time and money. SJJPA is looking at different options to get under 6 hours.
One option is pretty scummy. It would be to terminate trains in Emeryville instead of Oakland.
Another option would be to skip a stop or two, likely Lodi. Also not good.
A better option would be to increase speeds to 90mph. They’re “measuring the option.”
A few years ago, I made a post about how Bakersfield was planning to bulldoze a neighborhood to build yet another freeway. I am rarely in Bakersfield, so in those 5 years, I didn’t really follow the project, aside from knowing it was chugging along. (I actually did stop in Bakersfield in August for dinner, coming back from Six Flags, but didn’t explore). Usually, big infrastructure projects take years to happen. At the time, Bakersfield was looking at alternative routes. If it takes Fresno 10 years to build improved bus stops, Boston 30 years to extend a trolley route, and NYC 60 years to add a subway station, surely things in Bakersfield would move slowly. Demolishing an existing neighborhood is no small feat.
Well, Ryan Young recently took a visit and photographed the progress. The freeway is indeed under construction, and the neighborhood is gone. He reports:
Westpark is a neighborhood like any other in Central Bakersfield. It’s filled with single-story ranch homes from the 50’s and 60’s; its streets are wide, clean, and lined with orderly parked cars; its lawns are neatly divided by fully matured palm trees.
But Westpark is a neighborhood under siege.
Over the past several years, city bulldozers sliced a wide, sterile arc directly through the heart of the neighborhood; they razed at least 300 homes and 120 businesses. And now, where the humble homesteads of hundreds of families and retirees once stood, there is nothing–just woodchips and orphaned cross-streets as far as the eye can see.
…
So if Bakersfield is going to be build this freeway after all, then I hope we at least remember that we threw a community under that bulldozer. I hope we can say that, in the end, we did give a s—t.Click to read more!