Tag: enterprise trail

Thoughts on proposed Clovis Trail Bridge

I was not able to attend the meeting last week, but I did get a hold of the presentation. As a reminder:

The City is interested in hearing from residents, business owners, special interest groups, and any other parties on the draft plan. The proposed project is intended to focus on the need, feasibility, and future development of a Class I trail/pedestrian bridge along the Enterprise Canal, extending south of Owens Mountain Parkway, and over State Route 168, which will serve to link the commercial, residential, Clovis Community Medical Center Complex, and business campuses in the immediate area. Click to read more!

Clovis: Public Meeting on Proposed Trail Bridge 1/24/2018

A bit late notice, but looks like Clovis is finally moving forward with plans on connecting the trails near Clovis Community Hospital, which are separated by CA-168.

Date: Wednesday, January 24, 2018
Time: 5:30 p.m. – 7:30 p.m.
Location: Miss Winkles Pet Adoption Center
85 N Temperance Ave, Clovis, CA 93611

Notice:
http://www.ci.clovis.ca.us/Portals/0/Documents/Planning/Public%20Workshop%20Announcement.pdf?ver=2018-01-12-164853-177

The City is interested in hearing from residents, business owners, special interest groups, and any
other parties on the draft plan. The proposed project is intended to focus on the need, feasibility,
and future development of a Class I trail/pedestrian bridge along the Enterprise Canal, extending
south of Owens Mountain Parkway, and over State Route 168, which will serve to link the
commercial, residential, Clovis Community Medical Center Complex, and business campuses in
the immediate area. Click to read more!

A look at the newest bicycle trailhead in Clovis (picture tour)

Let’s take a little break from Downtown Fresno and jump all the way up to the far reaches of Clovis, or more specifically, Shepherd and Sunnyside. Clovis has built a new park and trailhead for the “Dry Creek Trail” that runs south and eventually connects with the Old Town Trail. In the future, the trail will continue north, and presumably link to the partially built trail to the west (Enterprise).

The trailhead includes some nifty new features, such as a bike repair station, a water fountain with a water bottle feature, some interesting art, maps, and more.

For some history, way back in July 2013, this project was announced, and I last looked at this project in August, when work had barely begun. Click to read more!

Quick look at new trailhead construction in Clovis

It’s embarrassing how long it has taken me to get these pictures up, but I’m almost done! What that means is that construction will be much further along than noted, but thee pictures give a good idea of the space being taken up.

I’m talking about a new trailhead being built for the Dry Creek Trail, and eventually (maybe), the Enterprise trail.

This map shows the existing Dry Creek Trail in blue, and the enterprise trail in purple. The dotted section has a property in the way, so we may be looking at 10+ years for that to happen.

 

The trailhead parcel is quite large


We start across the canal Click to read more!

Pictures of newly extended Enterprise Trail in Clovis

I’m still making my way through a backlog of pictures. These were taken last month.

I’m looking at a new section of the Enterprise Trail in Clovis. I previously looked at it before here.

Construction happened very quickly, but it’s a very odd trail. Goes absolutely nowhere. In this map I showed before, the green was the existing, and the orange is new.

There was one modification, a section of trail was built from the end of
the orange line to the west, where the road dead ends. Thats a shopping
center with a Mcdonalds, Starbucks, etc. I believe that section is temporary.

We start at that little shopping thing, looking west. It’s just a sidewalk. Click to read more!

Enterprise Trail Construction Under Way

It was only a month ago that I posted about Clovis getting a new trail extension. The Enterprise trail currently runs adjacent to a canal from Nees (near Temperance) to near Fowler and Shepherd.

The new extension starts at Temperance and runs along the canal towards the 168 freeway.

Oddly enough, the new construction does not connect to the existing trail. existing is green, new is in orange.

Let’s have a look at what’s been done:

While a gravel road runs along the canal, as is always the case, the trail runs besides that. I think it’s a shame because you don’t get to run/bike along the water. Click to read more!

Three minor trail updates coming to area

Some small trail news from Fresno and Clovis.

Fresno will be adding five new drinking fountains on the sugar-pine trail that runs along Shepherd. I’d prefer lights, but it’s something. While Clovis has many amenities along the trail, Fresno does not.

Fresno will also be adding in another new section of trail along Herndon.  A couple of months ago, they approved an addition between Fruit and Palm. Now it will be between Marks and Valentine. Green is existing, orange is new.

Google Map

  photo trail2_zps039ac3a3.png

Clovis will be adding a new half-mile trail on the far east side of town, along the Enterprise Canal. The trail will connect from nothing to nothing. Makes no sense really. Click to read more!

Clovis adding large trailhead to Dry Creek Trail

The City of Clovis is looking to convert 2.5 acres of vacant land at Shepherd and Sunnyside into a new trailhead. The project would slightly extend Dry Creek Trail to Shepherd, and provide future connections to a new trail north, and the existing Enterprise Trail to the East. I recently provided a picture tour of a gap-closure on a portion of this same trail.

Here is an area trail map, with the trailhead indicated by the red arrow

 photo shepherd1_zps67cdf125.jpg

Here is another map showing the same thing. Dark green solid lines indicate the two trails, with the red line indicating where they end. The dotted green line is a future trail, which today is accessible as a dirt canal bank. The dotted beige line is a future trail (long distance future). The yellow shape is the planned trailhead Click to read more!

Three area trails to get a little longer

Even though the Measure C website welcomes you with a large graphic promising miles of new trails,  you’ll find that the Fresno-area trail system has grown remarkably little over the past decade (I’ll be soon posting an interesting map from the 70’s to compare).

For 2013, there’s nothing major in the work, but three small projects have recently made their way through the Fresno and Clovis councils which should make trail use slightly better. These three projects don’t have exact build dates, but I would expect the first two to be useable by summer and the third by the end of the year. I will discuss them in the order they appeared before the councils. Click to read more!