Belated Downtown Fresno Photo Update

I went downtown a couple of months ago (January) to take photos, as I usually do. I hesitated on posting them because frankly, not much has changed over the last year. This is in contrast to five years ago, when there was always a new building popping up.

Then corona hit, and the photos seemed even less relevant, but now I’ve changed my mind on that. With the virus, everything is essentially frozen in time. Nothing is under construction, nothing will be open any time soon, and nobody is lining up to lay down piles of cash on new development. That is, even if the virus suddenly disappeared tomorrow, there are too many questions about the economy for investors. Will people get their jobs back? Will there be a change in demand for office space? Click to read more!

Fresno downtown and midtown photo update!

This will be my last Fresno construction update photo dump for awhile! Once again, I’ve gotten far behind and my photos are quickly becoming out of date. So rather than 2-3 posts, they’re all going in here!=&0=&=&1=&

A quick look at the reconstruction of the Tuolumne bridge for HSR

One of the most obvious signs of High Speed’s Rail’s (HSR) coming arrival to downtown Fresno has been the demolition – and now reconstruction – of the Tuolumne street bridge. The bridge was two lanes wide and carried traffic eastbound over the Union Pacific right of way. It was paired with the Stanislaus Street bridge which carries two lanes westbound.  

Both bridges will be demolished and replaced by a single bridge carrying traffic in both directions. The bridge will feature wider sidewalks as well. The reason is that aside from being 50 years old (or more?), the current structure of the bridge does not allow enough room for the new High Speed Rail tracks to fit. Once the new bridge is in place, and the Stanislaus Street bridge has been demolished, more serious work can be done downtown to create the new tracks and station.

Meanwhile, other construction is underway just north of downtown, as they have begun to build a trench. However, I was unable to get any good pictures. The construction area is surrounded by private property or the highway. 

Let’s take a look at the work on the bridge. I will begin with pictures I took back in January to see what it looked like a few days before closing forever. Below them are the pictures I took two weeks ago showing the current progress.

Here is the bridge back in January, taken from the sister bridge.

Frankly I don’t understand  why so much space has been wasted for 100 years.

 The bridge itself

 Not the best of sidewalk conditions.

I’m sure the structure itself was on its way out.

 Coming back you see the official sidewalk path – not ADA

The old pedestrian path also didn’t inspire much confidence in safety.  

 Frankly, I wouldn’t have felt comfortable parking here.

But these folks did.

There she is.

Wasn’t surprised to see this.

Looking towards Fulton.

That was January!

Now let us look at some recent pictures, starting from the other bridge again:



As an aside, here we are on the same bridge looking north.  No other construction is visible.

  

 I don’t know if this bridge will also be rebuilt (max zoom!) 

Oddly, they removed the traffic signal head but kept the signal functioning. What was the point, huge waste of time. Should be blinking red.

Bridge used to touch down here.

A new view of these lofts. I don’t know if they’re losing their parking lot?

Now from H street.

The other bridge.

The new supports.

H is blocked off for construction.

I hope the new bridge has good lighting underneath, especially because it will be much wider.

 And now walking back.

Hope you enjoyed the pictures!